El Barco Hydropower Plant (Logroño)

   

River: Ebro
Municipality: Fuenmayor, Logroño
Installed Output: 3.200 kW
Commissioning: May 2004
ISO Certificate 14001: ES030168-E

The El Barco Hydropower Plant was built respecting the old building of an existing historic flour mill alongside.

A series of studies were carried out between 2001 and 2005 accompanied by environmental adaptation work within the area of influence of this plant:

» Prior study of the environmental quality of the area (2001)

» Follow up and environmental surveillance of the Plant’s initial construction phase (2003-2004)

» Follow up and environmental surveillance of the Plant’s final construction phase and the first year of operation (2004-2005)

Click here to access the report drawn up by the Environmental Study Team.

 