home | contact | español  
   
     
 

Alcolea Hydropower Plant (Córdoba)

   

River: Guadalquivir
Municipality: Alcolea, Córdoba
Installed Output: 2.600 kW
Commissioning: March 2003
ISO Certificate 14001: ES030168-F

The Alcolea Hydropower Plant is located on the left bank of the River Guadalquivir, on land belonging to the municipal district of Alcolea, in the Municipality of Cordoba, specifically around 5 kilometres upstream from the city of Cordoba.

As with the other Energy Resources plants, work on the Alcolea plant included the implementation of an on-site environmental management system, meeting the requirements for the award of ISO 14001 Certification in 2004, renewed on a yearly basis through follow up visits and with scheduled recertification every 3 years.

El Barco H.P. :: Antella Escalona H.P. :: La Isabela H.P. :: Villa Los Ángeles H.P. :: La Zaida H.P. :: El Arenal H.P. :: A. Villa Los Ángeles

   legal warning powered by adhocnet